Data & Facts
Building the future
The new E.ON power plant at Gönyű, with a gross capacity of 433 MW, will be the most modern and efficient plant in Hungary. The exceptionally high net efficiency of 58 % will be achieved by a combined gas and steam turbine operation. The plant can supply energy for more than 600 000 households in a reliable and environmentally friendly way.
At the same time, E.ON is creating 30 new jobs, thereby boosting employment in the region. And E.ON plans to employ an additional 500 workers during the construction phase. These positive effects all add up to a brighter future for the people of Gönyű.
| Gross electrical capacity | 433 MW |
| Net electrical capacity | 425 MW |
| Electrical capacity of gas turbine | 285 MW |
| Electrical capacity of steam turbine | 148 MW |
| Electrical efficiency | ≥ 58% |
| Height of stack | 60 m |
| Start of construction | January 2009 |
| Gas consumption | aprox. 580 000 000 m3/year aprox. 75 000 m3/h |
| Number of burners | 24 |
The figures above represent nominal figures which may vary depending on the actual operational mode.
| HRSG | |
| High pressure part: Benson type | |
| Main steam flow | 77.6 kg/s |
| Main steam pressure | 125 bar |
| Main steam temperature | 565 °C |
| Steam turbine | |
| Construction | combined HP/IP and 2 LP flows |
| Grid voltage | 400 kV |